Algeria

2014

  • S.S. TAMANRASSET, 220/10kV
    ADE Algeria
    Delivery of control and protection system
  • Three S.S. BECHAR, 30/10kV
    SONELGAZ Algeria
    Commissioning of extended of control system
  • SWY BOUFARIK, 60/30kV
    PWS Algeria
    Delivery of protection and control system

2013

  • SWY BOUFARIK, 60/30kV
    PWS
    Delivery of protection and control system

2012

  • S.S. TAMANRASSET, 220/10kV
    ADE
    Design of control and protection system
  • S.S. EL KSEUR, 220kV
    PWS
    Delivery of busbar protection system
  • Three S.S. BECHAR, 30/10kV
    SONELGAZ
    Extension of control system

2011

  • S.S. SKIKDA VILLE
    SONELGAZ - CDE, PROJECT 2 SCADA
    Redesign and upgrade RTU based control systems
  • S.S. BEJAJA
    SONELGAZ - CDE, PROJECT 2 SCADA
    Redesign and upgrade RTU based control systems

2010

  • S.S. OUED DJER, 60/30kV
    ONID
    Commissioning of SCS and protection system

2009

  • S.S. AIN DJASSER, 220kV
    SONELGAZ
    Commissioning of the protection system and SCS
  • S.S. HASSI R’MEL, 60/5kV
    SONATRACH
    Commissioning of the protection system and SCS
  • S.S. EL MADHER, 60/30kV
    SONELGAZ
    Intervention on gateway type COM581
  • S.S. OUED DJER, 60/30kV
    ONID
    Delivery of protection and SCS
    Design of protection and SCS

2008

  • S.S. DJASSER, 220kV
    SONELGAZ
    Commissioning of the protection system and SCS
  • S.S. ARBAA, 220/60kV
    SONELGAZ
    Commissioning of the extended protection system and SCS
  • S.S. HASSI R’MEL, 60/5kV
    SONATRACH
    Configuration, setting and testing of the control and protection systems and commissioning of the control and protection systems
  • Mobile S.S. 220kV
    SONELGAZ
    Factory acceptance testing of protection and SCS systems
  • Mobile S.S. 60kV
    SONELGAZ
    Factory acceptance testing of protection and SCS systems
  • S.S. EL MADHER, 60/30kV
    SONELGAZ
    Intervention on gateway type COM581

2007

  • S.S. AIN DJASSER SWITCHYARD, 220kV
    SONELGAZ
    Configuration, setting and testing of the protection system and SCS
  • S.S. ARBAA, 220/60kV
    SONELGAZ
    Extension of SCS Configuration, setting and testing
  • S.S. SONELGAZ 8, 132/60kV
    SONELGAZ
    Configuration, parameterisation and design of gateway type COM500
  • S.S. MOBIL, 60/11kV
    Paper mill TAKA
    Testing of protection and SCS systems
  • S.S. DESALINISATION UNIT HAMA , 60kV
    HAMA
    Testing of protection and SCS systems
  • S.S. EL MADHER, 60/30kV
    SONELGAZ
    Commissioning of gateway type COM581
  • Eight S.S. SONELGAZ, 132/60kV
    SONELGAZ
    Commissioning of gateway type COM500

2005

  • S.S. EL MADHER, 60/30kV
    SONELGAZ
    Commissioning of protection and SCS system
  • S.S. ARZEW
    SONELGAZ
    Commissioning of protection system

2004

  • S.S. VALMASCORT, 60/30kV
    SONEGLAZ
    Commissioning of the protection and SCADA system
  • S.S. VALMASCORT, 60/30kV
    SONELGAZ
    Commissioning of the protection and SCADA system
  • S.S. ARBAA
    SONELGAZ
    Extension of existing protection and control system design, configuration and delivery

2003

  • S.S. BEL HIRANE, 220/30kV
    SONELGAZ
    Commissioning of the protection and SCADA system
  • S.S. NEZLA, 220/30kV
    SONELGAZ
    Commissioning of the protection and SCADA system
  • S.S. HADJIRA, 220/30kV
    SONELGAZ
    Commissioning of the protection and SCADA system
  • S.S. MONSOURAH, 60/30/10kV
    SONELGAZ
    Commissioning of the protection and SCADA system
  • S.S. SEDDIKIA, 60/30/10kV
    SONELGAZ
    Commissioning of the protection and SCADA system
  • S.S. EL HARRACH, 60/10kV
    SONELGAZ
    Commissioning of the protection and SCADA system
  • S.S. ARBAA, 220/60kV
    SONELGAZ
    Commissioning of the protection and SCADA system

2002

  • S.S. BEL HIRANE, 220/30kV
    SONELGAZ
    Commissioning of the protection system