Iraq

2012

  • M.O.E. Iraq, IRAQ STAGE 5
    Commissioning of protection and SCS
  • S.S. KHORMALA
    M.O.E. Iraq
    Commissioning of protection and SCS

2009

  • Eleven S.S. SULAIMANIYAH STAGE IV, 132/33/11kV
    M.O.E. Iraq, SULAIMANIYAH STAGE IV
    Delivery of protection and local control systems for
    Design of protection and local control systems for

2005

  • S.S. MOSUL NORTH 1, 400kV
    M.O.E. Iraq
    Design of local control panels
    Design of local control panels,
  • S.S. DUHOK, 400kV
    M.O.E. Iraq
    Design of 400kV busbar protection system for