Great Britain

2017

  • S.S. HAMS HALL SWY , 400kV
    NATIONAL GRID UK
    Commissioning of C.B. SWITCHSYNC F236 regulator – Continued

2016

  • S.S. HUNTERSTON, 400kV
    NATIONAL GRID UK
    Commissioning of C.B. SWITCHSYNC F236 regulator
  • S.S. CARDIFF , 400kV
    VATTENFALL UK
    Commissioning of C.B. SWITCHSYNC F236 regulator
  • S.S. KILGALLIOCH , 275kV
    SP ENERGY NETWORK UK
    Commissioning of C.B. SWITCHSYNC F236 regulator

2015

  • S.S. DRAKELOW, 400kV
    NATIONAL GRID UK
    Commissioning of C.B. SWITCHSYNC F236 regulator

2014

  • W.P.P. WPP BLEO HOLM NORTH SEA
    Talisman AB United Kingdom
    Overhaul Testing of generator protection system

2013

  • S.S. PENTIR, 400/110kV
    National Grid UK
    Commissioning of SWITCHSYNC F236 regulator
  • W.P.P. BLEO HOLM NORTH SEA
    Talisman AB
    Overhaul Testing of generator protection system

2012

  • S.S. BEAULY, 275/400kV
    Scottish and Southern Energy, Scotland
    Commissioning of SWITCHSYNC T183 regulator

2011

  • OIL RIG CAPTAIN
    Chevron UK
    Preventive testing of the line differential protection of MV cable

2007

  • OIL RIG CAPTAIN OFF SHORE
    CHEVRON
    Delivery the line differential protection of MV cable delivery of comunication converter
    Overhaul testing of the protection system and and delivery and commissioning of communication converter SPA/MODBUS
  • T.P.P. CORYTON
    CORYTON
    Overalll testing of the generator protection system
  • T.P.P. ROOSECOTE 230 MW
    ROOSECOTE CCGT
    INSPECTION – testing of generator protection

2006

  • T.P.P. SELCHP
    SELCHP
    Overall testing of the generator protection
  • WPP ANDREW OFF SHORE
    BP
    Commissioning of the protection system
  • OIL RIG FPSO CAPTAIN OFF SHORE
    CHEVRON
    Overhaul testing of the line differential protection of MV cable
  • OIL RIG FSR DOUGLAS OFF SHORE
    BHP BILLITON
    Overhall testing protection
  • T.P.P. ROOSECOTE
    ROOSECOTE CCGT
    Overhall testing of the generator protection