  • S.S. OUED DJER, 60/30kV
    ONID, Algeria
    Commissioning of SCS and protection system
  • S.S. UGWUAJI, 330/33kV
    NIPP Transmission, Nigeria
    Protection system, control system and AC/DC auxiliary supply.
    Overall design, production, FAT, erection supervision and commissioning of delivered material.
  • S.S. OKE ARO, 330/132/33kV
    NIPP Transmission, Nigeria
    Protection system, control system and AC/DC auxiliary supply.
  • S.S. LA ARENOSA, 765/400/230/20kV
    EDELCA, Venezuela
    Commissioning of SCS and protection system
  • S.S. YARACUY, 765/400/230/20kV
    EDELCA, Venezuela
    Commissioning of SCS and protection system
  • S.S. ALUMINIUM ZAVOD, 330/110/33/10kV
    AZERENERJI, Azerbaijan
    Commissioning leadership and commissioning of SCS and protection system
  • S.S. SAMUK, 500/330/10kV
    AZERENERJI, Azerbaijan
    Commissioning leadership and commissioning of SCS and protection system
  • S.S. LUDVIKA, 145/10kV
    ABB LUDVIKA, Sweden
    Design and delivery of protection and local control systems
    Commissioning of protection system and local control system
  • S.S. TALUM d.d., 110/10kV
    TALUM d.d., Slovenia
    Delivery of back-up transformer protection for TR1, TR2 and TR3
    Overhaul testing of protection system. Erection and testing of back-up transformer protection for TR1, TR2 and TR3
  • T.P.P. VALUTHUR 95MW
    India
    Commissioning of SCS protection
  • SONELGAZ
    SONELGAZ, France
    Integration of ABB IED into protection system
  • S.S. ANGAMOS, 220kV
    AES Gener, Chile
    General training of End User operators on secondary systems and Commissioning of protection system due to change of bay type
  • S.S. HELIOS, 110/20kV
    EON, Bulgaria
    Commissioning of SCS system